Commercial – Bundaberg Multiplex

Bundaberg Multiplex —Bundaberg QLD

 

 

 

 

 

 

  • Technical Aspects:
    • Started modelling work prior to any design documentation being completed.
    • IFC design delivery, complete with sketches for connection details.
    • Pre Shop drawing approval undertaken using IFC models and Tekla BIMSight.
  • IPD Workflow: “Engaged by design consultant under minor consultant’s agreement”
  • Project Type: Commercial / Industrial
  • Client: GHD
  • Project Year: 2014
  • Project Specifications:
    • 9500 sq/m of floor space – Single Level – Steelwork – Precast Panels.
  • Steelwork Tonnage: 390t
  • Cold Rolled ‘Meters’: 13500l/m
  • Precast tonnage: 2090t
  • Precast Sq/m: 4800 sq/m (One Face)

 

Anecdotal:

 

We were engaged by GHD to work in an IPD framework, whereby collaboratively we would deliver the builder Shop Detail dwgs and reports earlier than could be expected under traditional workflow    methods. Material reports were used in the Tender process to give a more accurate representation of the steelwork tonnage and precast sq/m, in order for the builder to obtain sharper pricing from subcontractors.